Home | Projects | London City Airport Terminal Extension

London City Airport Terminal Extension

Location: Royal Docks, London
Value: £17.5m
Main Contractor: Kilnbridge
Client: London City Airport
Sector: Aviation

Scope of works

Kilnbridge were appointed as Main Contractor by London City Airport to construct new terminal facilities as part of the City Airport Development Programme.

The scope included:

  • Construction of two new energy centres
  • Extension to the main terminal both to the east and west including associated airside and landside works with complex marine piling and stitch connections
  • Construction of the 500m long New East Pier to accommodate an additional eight new plane stands
  • Extensive demolition works including existing control tower, baggage structures and Global Infrastructure Facility
  • Strip out, de-cladding and roof removal
  • Design development to RIBA Stage 5

Challenges / Achievements

  • Works were carried out in a detailed sequential manner to ensure continual, uninterrupted operation of the live airport
  • Significant value engineering to the design resulting in an improved product, elimination of safety risks, reduced programme duration and cost savings
See more of our projects
Top